Today was more stenciling for the rear door and manufacturing brackets for attaching the solar panels onto the roof racks. Will require a four man job to lift them onto the van. Time to start feeding the internal wiring network.











Today was more stenciling for the rear door and manufacturing brackets for attaching the solar panels onto the roof racks. Will require a four man job to lift them onto the van. Time to start feeding the internal wiring network.
© 2025 Serat Bushcraft
Theme by Anders Noren — Up ↑
Leave a Reply